Production line

Semi-automatic Potato Chips Process Production Line

Semi-automatic potato chips Production line

Washer & peeler —Cutter—bleaching machine —dewater machine—frying machine—deoiling machine -Packing machine

These are all steps of the potato chips production line.

Remark: Overall SUS304 stainless steel except for electrical elements and special design needed parts.

Benefits of oil-water separation in Processing Line

  • Oil saving: This machine completely changes the structure of the traditional fryer and adopts the integrated structure of oil and water. The upper layer releases oil, the lower layer releases water, and the residues generated during frying are all submerged in the water without scorching. The lower layer of water continuously generates water vapor to add trace water to the high-temperature frying oil to ensure that the frying oil does not become black, thereby extending the Oil change cycle to save oil. It can save more than 50% oil than traditional oil.
  • Health and environmental protection: In traditional frying pans, the fried food is prone to fry coke, and the oil that has been fried many times is blackened and has many impurities. The fried food is not good for health. In the oil-water mixed fryer, the water in the lower layer can filter impurities in the oil. The fried food is not only good in color, fragrance, and taste but also has a clean and beautiful appearance. It also improves product quality, extends shelf life, and is beneficial to health.

Others information About Production  Line

1)Fuel consumption: Gas/Diesel

Gas: Max 50kw/h electricity and 105Nm³/h nature gas or LPG 90kg/h.

Diesel: Max 50kw/h electricity and max 80kg/h diesel.

  • The estimate input and output rate for potato chips project
  • Input capacity: about 600-800kg/h, output capacity: min 200kg/h
  • The water consumption: 1.5ton/h, drinking water
  • The workshop drawing needs to arrange the whole process after Contract or further communication from the buyer’s engineer.

Our Service About Production Line

  1. 1. Are you a manufacturer? Yes, we are. Welcome to visit our factory.
  2. Can you change the machine voltage as our request? Yes, we can.
  3. How about your after-sales service? our engineer can go outside to install and train your workers to operate the full machine line.
  1. Warranty time of your machine? 1 year except for consumable spare parts.
  2. How about the delivery time of your machine? Generally, it needs 5-7 days for big machines or

producing line, and it will be much longer but within our negotiated delivery time.

Certificates of Our Company

Certificates
Authoritative
Interested? Contact us now for more details!



4 Comments

Click here to post a comment